Scope
The project involves the preparation, splicing, and testing of a 432F fiber optic cable at the Ruwi POP (Point of Presence).
This includes:
• Cable preparation
• Fiber optic splicing
• Testing to ensure connectivity and quality of the fiber optic network
This includes:
• Cable preparation
• Fiber optic splicing
• Testing to ensure connectivity and quality of the fiber optic network